ATV/Stock bridge

By: QUIGLEYS FARM BRIDGES  23-Apr-2014
Keywords: Farming, Dairy Farming, Farm Bridges

This design is a little gem. If you require a crossing up to 15 metres and you only require it for stock, atv or car and trailer then this is the best way to go. This design will take 5ton and is 2m between kerbs. If you have a ford and only require gear over the stream 1 or 2 times a year but need a stock and a bike all year round then this is the best option for you. It is cost effective and can be installed in a day. Call us to see if this is an option for you.

Keywords: Concrete Bridges, Dairy Farming, Farm Bridges, Farming, Rural Bridges

Contact QUIGLEYS FARM BRIDGES

Email

Print this page

Other products and services from QUIGLEYS FARM BRIDGES

16-Jul-2014

clear span pre stressed concrete bridges

The best bridge you will ever invest in, you will never regret having a Quigley's bridge, just ask those that have one or more of our bridges.


16-Jul-2014

clear span pre stressed concrete bridges

The best bridge you will ever invest in.


23-Apr-2014

Irrigation panels

We have a special design for LARGE Walk around IRRIGATION SYSTEMS. Our Irrigation Crossing design is:- Quick and easy to install, Cost effective, Will take an ATV. Designed for the 4 ton loading's, No further work is required, Once positioned they are good to go. For all your needs give the friendly team a call. Visit our web page. You will find a variety of our bridges on it.


23-Apr-2014

16m to 42 m pre stressed concrete bridge

The best bridge out there. Strong - Durable - Built to last - Value for Money - Service beyond the Call of Duty Built to the Transit Bridge Manual and code compliant. NO corners cut, We understand your farming needs as we run a Hereford Stud so we do care and we do know.


23-Apr-2014

Modular concrete bridge 10m to 15m

The best Bridge out there. Built and installed by the best team out there.


23-Apr-2014

pre stressed concrete bridge 6m to 10m

Our bridge design will bridge it for you. Our costs are competitive, however with our bridge, you get the real deal, that will last as it is code compliant WE ARE here to help you with a cost effective solution for your needs. Our quotes are drive on drive off. Been bridging for over 25 years view our web site for photos and testimonies call the Family team that CARES